DOE/LANL Jurisdiction Fire Danger Rating:
  1. LANL Home
  2. media
  3. publications
  4. national security science
July 26, 2021

What's on board now?

The Navy’s current warheads have been updated over the years.

  • Whitney Spivey, Editor
D5 Launch Horizontal Opt
The W76 and W88 warheads, which could be deployed from submarines, have been maintained primarily by Los Alamos through life extension programs, modifications, and alterations. Credit to: U.S. Navy

The W76 and W88, the two types of nuclear warheads that can be launched on missiles from Ohio-class submarines, were both designed at Los Alamos National Laboratory. In the decades since, they’ve also been maintained primarily by Los Alamos through life extension programs (LEPs), modifications (Mods), and alterations (Alts).

Sub Weapons
W76 and W88 LEPs, Mods, and Alts.

W76-1 LEP

LEPs address aging and performance issues, enhance safety features, and improve security. Through an LEP, scientists and engineers analyze a weapon’s components and, based on that analysis, reuse, refurbish, or replace certain components.

Completed in January 2019, the W76-1 LEP was a refurbishment of the W76-0 warhead, which entered the stockpile in 1978. The LEP extended the warhead’s service life from 20 to 60 years. The W76-1 continues to meet all missions and capabilities of the original W76-0 warhead but does not provide new military capabilities.

W76-2 Mod

Modifications change a weapon’s operational capabilities. A modification may enhance the margin against failure, increase safety, improve security, replace limited-life components, or address identified defects and component obsolescence.

The W76-2 Mod, a Los Alamos program, is a modification of the W76-1 warhead. The W76-1 produces a high nuclear yield; the W76-2 provides a low-yield, sea-launched ballistic missile warhead capability. The first W76-2 was produced on February 22, 2019, at the Pantex Plant in Amarillo, Texas.

W88 Alt 370

Alterations are changes to a weapon’s systems, subsystems, or components. Not as extensive as an LEP, an alteration is a limited-scope change that affects the assembly, maintenance, and/or storage of a weapon. The alteration may address identified defects and component obsolescence without changing a weapon’s operational capabilities.

The W88 nuclear warhead entered the stockpile in 1988. Deployed now for more than 30 years, the warhead requires several updates to address aging issues and to maintain its current state of readiness. Started in 2012, the W88 Alt 370 program replaces the arming, fuzing, and firing subsystem, adds a lightning arrestor connector, and refreshes the weapon’s conventional high explosives to enhance nuclear safety and support future LEP options. The first production unit was delivered in July 2021.

Share

Stay up to date
Get the latest content from National Security Science delivered straight to your inbox.
Subscribe Now

More National Security Science Stories

National Security Science Home
Darht Cover

The engineering issue

From the Manhattan Project to current efforts in maintaining and modernizing the U.S. nuclear arsenal, Los Alamos engineers play a vital role.

Engineering at Los Alamos Thumbnail

Engineering at Los Alamos National Laboratory

At Los Alamos National Laboratory, engineering plays a pivotal role in several areas.

Hill, John

A new chief engineer

John Hill brings more than 40 years of experience to the job.

Abstracts Sprints

Elevating engineering

A leadership group strengthens and supports engineering across the Lab.

Abstracts Sprints Peanutbutter

Peanut butter, potting soil, and prototype engineering

Los Alamos innovation sprints train engineers to solve critical challenges through hands-on creativity.

Abstracts W93sub

Full ahead for the W93

Los Alamos engineers help design a new warhead for submarine-launched ballistic missiles.

Follow us

Keep up with the latest news from the Lab