| At the beginning of FY00 an implementation plan was instituted for
the Laboratory’s archiving project. Below is a summary of the progress
for the P-22 portion of the project. All goals were either met or
exceeded. Progress for first Half of FY00 FY00, Quarter 1: 1. Complete reaction history code (ALFA) and release it for production analysis tasks. (Code is in
production and frozen against changes until 4th quarter
review) 2. Reanalyze the reaction history for 5 NTS events (4 events were
re-analyzed and stored on XWARP) 3. Complete the EMP procedure handbook (EMP procedure
book is complete and available on XWARP) 4. Begin collection of data and technical information for a comprehensive W-76 reaction history report (Still in data
gathering stage—specific work done for X-4 and X-2) 5. Satisfy the security requirements to allow necessary communication with X-Division (Entire P-22
analysis team is communicating with XWARP) 6. Complete the architecture of the P-22 classified server and LAN (LAN is complete and operational) FY00, Quarter 2: 7. Reanalyze the reaction history from 5 NTS events. (10 events were
re-analyzed and stored on XWARP) 8. Complete Floydada and Whiteface EMP reports. (Reports are
complete and are on XWARP under EMP folder) 9. Start discussion with members from TSA-1, DX-3 and X-4 regarding requirements for the statistical study of the alpha function. (Good progress in
this area. Statistical methods are being chosen and applied) 10. Prepare a job ad to initiate a search for replacement personnel. (1/2 FTE has been
added to Bechtel effort. Training of two P-22 TSMs will begin in 3rd
Quarter) 11. Start dedicated effort to replace editing code, TEKEDT, from the VAX to the PC (Some progress
has been made on Magplot, the TEKEDT replacement. However a reevaluation
of software needs has now placed the convolution code conversion at a
higher priority. Earnest work on CONFOLD (convolution code) will begin
in the 3rd Quarter
|