Current temperature: 55°F |
|
|||
|
||||
|
Wednesday, October 23, 2002 Employees should heed signs, stay out of construction areasConstruction activities are currently underway to re-roof the J. Robert Oppenheimer Study Center at Technical Area 3. The construction area is marked and posted with flags and orange fencing. For the safety of Lab and construction workers, it is imperative that these barriers be observed. The Study Center project is anticipated to be completed within the next two weeks. During this time, pedestrian access from Diamond Drive to the Otowi Building parking lot (east end) will require walking north at the construction fence to the University House driveway. Free access to the parking lot is available at the driveway. A safety inspector will be overseeing the sidewalk fencing. The inspector will request names and z numbers of individuals choosing to cross the construction fence. Individuals not complying with posted safety requirements will be reported to their division leader. Other Headlines Open enrollment, health-care plan changes for 2003 detailed more... Independent air quality audit shows Laboratory in compliance with Clean Air Act more... Groundbreaking ceremony held Tuesday for Lab's new BSL-3 facility more... UC professor talks on Chinese foreign policy Thursday at Lab more... Employees should heed signs, stay out of construction areas more... |
||||
Questions? Contact the Newsbulletin at newsbulletin@lanl.gov or 667-6103.
|
|
Operated by the Los Alamos National
Security, LLC for the U.S. Department
of Energy's NNSA Inside | © Copyright 2007-8 Los Alamos National Security, LLC All rights reserved | Disclaimer/Privacy |