Los Alamos National Laboratory
 
 
ADWP  Advanced Simulation and Computing Program, ASC

CONTACTS

  • ASC Program Director(Acting)
    Cheryl Wampler
    505-667-0147
  • ASC Deputy Program Director
    Scott Doebling
    505-667-6950
  • Communications Specialist
    Denise Sessions
    505-665-8906
  • Executive Administrator
    Laurie Helmer
    505-665-7827
ASC Logo

ASC Platform Installation: Roadrunner Arrives at Los Alamos


Protein Dynamics for Drug Design

IBM and LANL Team at IBM's Poughkeepsie plant where Roadrunner achieved a sustained petaFLOPS, or 1.026 petaFLOPS, in May 26, 2008.


Moving the first Connected Unit

Moving the first Connected Unit (CU) into the Metropolis Center for Modeling and Simulation

The first Roadrunner Phase 3 Connected Unit (CU) was delivered to Los Alamos on July 15, 2008. Shortly after delivery, IBM successfully kicked off a Linpack burn-in run on the first CU in the Metropolis Center for Modeling and Simulation.

LANL will begin acceptance testing this month. In January 2009, the file systems will be connected and scientists will begin system and code stabilization using weapons and open-science code runs. This installation is very exciting because of the potential for advancing science and engineering toward predictive capabilities for the ASC stockpile stewardship mission and other national needs.

video icon  Video (mp4)
Installation of Roadrunner Phase 3 at Los Alamos National Laboratory.
[Video is unclassified and approved for unlimited release LA-UR-08-05688.]


Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA
Inside | © Copyright 2008-09 Los Alamos National Security, LLC All rights reserved | Disclaimer/Privacy | Web Contact